Loading...
Way: Triangle Expressway (198298220)
Version #1
Western Wake Expressway Phase IX from US 64 in Apex to NC 55 in Holly Springs was opened Dec 20, 2012. Added the freeway and ramps with this start date. Veridea Parkway interchange opened Apr 3, 2017 added.
Tags
highway | motorway |
---|---|
name | Triangle Expressway |
oneway | yes |
start_date | 2012-12-20 |
Nodes
49 nodes
- 2088083113 (part of ways 198298218 and 198298219)
- 2088083125
- 2088083366 (part of way 198298238)
- 2088083126
- 2088083127
- 2088083386 (part of way 198298238)
- 2088083128
- 2088083129
- 2088083130
- 2088083131
- 2088083132
- 2088083133
- 2088083134
- 2088083135
- 2088083136 (part of way 198298234)
- 2088083137
- 2088083138
- 2088083351 (part of way 198298237)
- 2088083272 (part of way 198298230)
- 2088083139
- 2088083140
- 2088083141
- 2088083142
- 2088083237 (part of way 198298228)
- 2088083143
- 2088083144
- 2088083145
- 2088083255 (part of way 198298228)
- 2088083146
- 2088083147
- 2088083148
- 2088083149
- 2088083150
- 2088083151
- 2088083152
- 2088083153
- 2088083154
- 2088083155
- 2088083156
- 2088083157
- 2088083158
- 2088083159
- 2088083160
- 2088083161
- 2088083203 (part of way 198298225)
- 2088083162
- 2088083163
- 2088083164
- 2088082609 (part of ways Triangle Expressway (198298209) and 198298207)
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenHistoricalMap and contributors, under an open license |