Loading...
Way: 198298219
Version #1
Western Wake Expressway Phase IX from US 64 in Apex to NC 55 in Holly Springs was opened Dec 20, 2012. Added the freeway and ramps with this start date. Veridea Parkway interchange opened Apr 3, 2017 added.
Tags
highway | motorway_link |
---|---|
oneway | yes |
start_date | 2012-12-20 |
Nodes
12 nodes
- 2088083114 (part of way 198298281)
- 2088083115
- 2088083116
- 2088083117
- 2088083118
- 2088083119
- 2088083120
- 2088083121
- 2088083122
- 2088083123
- 2088083124
- 2088083113 (part of ways 198298218 and Triangle Expressway (198298220))
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenHistoricalMap and contributors, under an open license |